For this measurement it is only necessary to use a theodolite and to find out the exact instant of the quarter phase.
|
Per realitzar aquesta mesura només és necessari disposar d’un teodolit i saber l’instant exacte del quart.
|
Font: NLLB
|
A level or theodolite (total station) and a leveling staff will be needed to make altitude measurements
|
Es necessitarà un nivell o teodolit (estació total) i un bastó d’anivellament per fer els mesuraments d’altitud
|
Font: AINA
|
The new observatory design called for a stone building, with an attached tower containing the theodolite.
|
El disseny del nou observatori requeria un edifici de pedra, amb una torre adjunta que contenia el teodolit.
|
Font: wikimatrix
|
The north end of the main building was connected to a small conical dome which contained a theodolite used to make astronomical measurements for the accurate determination of the local time.
|
L’extrem nord de l’edifici principal estava connectat a una petita cúpula cònica que contenia un teodolit utilitzat per realitzar mesures astronòmiques per a la determinació precisa del temps local.
|
Font: wikimatrix
|
As late as the 1990s, the basic tools used in planar surveying were a tape measure for determining shorter distances, a level to determine height or elevation differences, and a theodolite, set on a tripod, to measure angles (horizontal and vertical), combined with the process of triangulation.
|
A finals dels 1990 s’utilitzaven com a eines bàsiques en l’agrimensura sobre el terreny, la cinta mètrica per mesurar les distàncies més curtes o diferències de cotes, i un teodolit fixat en un trípode per a mesurar angles horitzontals i verticals, en combinació amb la triangulació.
|
Font: NLLB
|
Mostra més exemples
|